The Production Function

The production system and its objectives, rigid, flexible and Just in Time production, plant layouts, planning with Gantt charts, productivity, the break-even point, operating leverage and the margin of safety.

📖 Source: Universidad Carlos III de Madrid · Topic 4_ The Production Function.pdf (Prof. Carmen Paz-Aparicio), Slides 1-43

Central idea: a production system converts inputs into outputs, and production (operations) management plans, designs, staffs and controls it. Its objectives — cost, quality, time of delivery and flexibility — partly contradict each other, so firms choose between rigid, flexible and Just in Time systems and between three plant layouts. Production is then planned (Gantt charts) and controlled for efficiency, a posteriori with productivity indexes and a priori with cost analysis: the break-even point $Q_0 = FC/(P - VC) = FC/m$, the operating leverage $OL = Q\,m/(Q\,m - FC)$ and the margin of safety.

The topic has three parts [Slide 2]: the function of production (concept, objectives and types of production systems: rigid, flexible and Just in Time), production planning and control with the Gantt chart, and the control of efficiency.

Part I — The function of production

§ 1 Concept [Slides 3-4]

A production system is a method for converting inputs into outputs. Production management (operations management) is the set of activities aimed at planning, designing, staffing and controlling a firm's production system [Slide 3].

The system has four elements [Slide 4]: the factors of production (creative, basic and managerial), the transformation process (tasks, flows and storage), the outputs, and the feedback that returns information from the outputs to the inputs. The whole system sits inside the generic and specific environment of Topic 2.

Environment generic and specific Factors of production creative, basic and managerial Transformation process tasks, flows and storage Outputs Feedback
Figure 1. A production system converts inputs (factors of production) into outputs through a transformation process, inside a generic and specific environment and with feedback (Slide 4).

§ 2 Objectives and their contradictions [Slides 5-6]

The function of production pursues four objectives [Slide 5]: cost, quality, time of delivery and flexibility. They can contradict each other [Slide 6]:

Pair of objectivesWhy they conflict
Cost - qualityhigher quality usually needs better materials, processes and controls, which cost more
Flexibility - costproducing many different products in small amounts loses the savings of standard, large-scale production
Time of delivery - costdelivering faster needs spare capacity, stocks or overtime, which cost more

The right-hand column explains the pairs in plain words; the slide names only the pairs.

Part II — Types of production systems

§ 3 Five generic types in three categories [Slides 7-9, 23]

Production systems are placed on the product-process matrix [Slide 7]: from project (civil engineering), craft (product under demand), batch (bakery) and mass (automobiles) to continuous production (petrochemistry). Towards the project end variability and flexibility grow; towards the continuous end volume grows.

Process Product Project Civil engineering Craft Product under demand Batch Bakery Mass Automobiles Continuous Petrochemistry Variability grows to the left Volume Flexibility
Figure 2. The five generic production systems, from project to continuous production, with an example of each; variability and flexibility grow towards the project end, volume towards the continuous end (Slides 7-8).

The five generic types are grouped in three categories [Slides 8-9]: rigid or continuous (mass and continuous), flexible or intermittent (craft and batch) and Just in Time. The project type stands apart, with individualized products. Slide 23 summarises them:

TypeProducts and resourcesPlant layout
Projectindividualized products: high cost, qualified workers, equipment for general use, difficult planning and controlfixed
Craft and batcha low quantity of a great variety of products; craft: more adaptability, less quantity; batch: more uniformity, more quantity (batch size)functional
Mass and continuousstandard products for mass markets, division of labour; mass: more dependent on workers than on machines; continuous: more dependent on machines than on workersproduct

§ 4 Rigid production [Slides 10-13]

Characteristics [Slide 10]: big volumes of production, commercialization at a low price, standard products, capital intensive.

Advantages of job specialization [Slide 11]: less time to learn a task; the simplicity of the task makes learning cheaper; no time lost changing from one task to another; the worker acquires expertise; a better fit between worker and job position; easy replacement of workers (and mechanization).

Organization of the factory [Slide 12]: division of labour into different job positions, assigned by seniority, which leads to the bureaucratization of the company. Its two types are mass production and continuous or process production [Slide 13].

§ 5 Flexible or intermittent production [Slides 14-17]

Characteristics [Slide 14]: flexible volumes of production, more complex and differentiated products, more highly qualified workers, equipment for general use.

Organization [Slide 15]: plant layout based on teamwork, workers with more responsibility, fewer hierarchical levels, employee rotation, and remuneration that depends on qualification. Its two types are craft and batch production [Slide 16].

Flexible versus rigid [Slide 17]: drawn against the volume of production, the total cost of the rigid system starts higher (more fixed cost) but grows more slowly (less variable cost per unit). Below the volume where the two lines cross (zone A) the flexible system is cheaper; above it (zone B) the rigid one is.

Volume of production Total cost flexible rigid crossing volume A: flexible cheaper B: rigid cheaper
Figure 3. Total cost of a flexible and a rigid system: the rigid one has higher fixed costs and a lower variable cost per unit, so it is cheaper only beyond the crossing volume (Slide 17).

§ 6 Just in Time [Slides 18-21]

Just in Time arose from the need to manufacture many types of automobiles, in small batches but under the same production process. It is based on requests and eliminates inventories [Slide 18]. Its competitive advantages are to manufacture high-quality products and to reduce the whole production cycle [Slide 19].

Element [Slides 20-21]Tool
Internal organizationjob cells
Plant distributionU shape
Mechanisms to support qualityJidoka, Poka Yoke
Mechanisms of visual controlAndon, control panels, work sheets, Kanban

The slides only name these tools.

§ 7 Plant layout [Slides 22-26]

There are three plant layouts [Slide 22]: functional or process, product and fixed.

LayoutAdvantagesDisadvantages
Functional or process [Slide 24]high use of the machines; machines easily replaced; operators of similar, nearby machines can train and supervise themselves; a specific incentive system for each workerdistance between functions; handling wastes when transporting materials; the flow of materials and the operators' work are difficult to standardize and to plan; activities are difficult to plan; lines are not balanced (some saturated, others free)
Product [Slide 25]little work in process; less space for transport and temporary storage; simpler planning and control; operators need little preparation; the flow of materials is easy to anticipateinflexible; the time is set by the slowest machine (bottlenecks must be avoided); a problem in one machine affects the whole process; high investment; incentive programmes per employee are difficult to define
Fixed [Slide 26]the product stays in one place and machinery, materials and labour are brought to it—

Part III — Production planning and control

§ 8 Planning and control [Slides 27-28]

Production planning is the determination of what products to produce and where, when and how to produce them. Production control is the effort to ensure that production plans or schedules are met [Slide 27]. The basic process has six steps [Slide 28]:

  1. Receiving the orders from customers.
  2. Developing a list of required materials.
  3. Developing a route sheet.
  4. Developing production schedules.
  5. Dispatching notices to operators to begin work.
  6. Following up to see that the schedule is being met.

§ 9 Gantt charts [Slides 29-32]

The Gantt chart, named after Henry Gantt, who developed it in the early 1900s, represents the phases and activities of a project work breakdown structure [Slide 30]. It is a bar chart that shows the scheduled start and stop dates of each production step; it is a visual illustration of times, used for non-complex projects; it normally does not show the dependency relationships between activities; and it shows the current schedule status with percent-complete shading and a vertical "TODAY" line [Slide 31].

Time A B C D E TODAY
Figure 4. A Gantt chart: one bar per activity from its scheduled start to its stop date; a vertical TODAY line shows the current status (Slides 30-31). Activities and dates only illustrative.

Part IV — Control of efficiency

§ 10 Efficiency, productivity and cost analysis [Slides 33-35]

The production system is controlled for efficiency, which is not the same as efficacy [Slide 33]. Two kinds of index are used: productivity, measured a posteriori, and cost analysis, a priori.

Total productivity relates everything produced to all the factors used, and a partial productivity to one factor only [Slide 34]:

$$\text{Total productivity} = \frac{\text{Goods and services}}{\text{Labour} + \text{Capital} + \text{Raw materials} + \text{Energy}} \qquad \text{Labour productivity} = \frac{\text{Goods and services}}{\text{Labour}}$$

Productivity depends on external factors, factors of capacity, product factors, factors of process design, factors of human resources and quality factors [Slide 35].

§ 11 Break-even point [Slides 36-38]

The break-even point (BEP) is the volume of sales or production at which the company covers its total costs, and from which it starts to make profits; it depends on the cost structure [Slide 36].

With price $P$ per unit, variable cost $VC$ per unit, fixed costs $FC$ and volume $Q$, revenue is $R = P\,Q$ and total cost $TC = FC + VC\,Q$, so

$$\text{Profit} = P\,Q - (VC\,Q + FC) = Q\,(P - VC) - FC$$

The unit margin is $m = P - VC$. At the break-even point the profit is zero, $Q_0\,m - FC = 0$ [Slide 37]:

$$Q_0 = \frac{FC}{P - VC} = \frac{FC}{m}$$
Q € FC VC TC = FC + VC R = P · Q Q0 losses profits
Figure 5. Revenue R and total cost TC = FC + VC against the volume Q: below Q0 the company has losses, above Q0 profits; Q0 = FC / (P − VC) = FC / m (Slide 37). Values only illustrative.

Slide 38 compares two cost structures with the same revenue line: case A, with higher fixed costs and a steeper profit line, and case B, with lower fixed costs and a flatter one. The break-even point moves with the cost structure.

§ 12 Operating leverage [Slides 39-41]

The operating leverage measures how a change in sales translates into a change in operating income (profit or loss) [Slide 40]. It is the relative change of the profit divided by the relative change of the volume [Slide 39]:

$$OL = \frac{\Delta \text{Profit} / \text{Profit}}{\Delta Q / Q}$$

Since $\text{Profit} = Q\,(P - VC) - FC$ and $FC$ does not change with $Q$, $\Delta\text{Profit} = \Delta Q\,(P - VC)$. Substituting,

$$OL = \frac{\dfrac{\Delta Q\,(P - VC)}{Q\,(P - VC) - FC}}{\dfrac{\Delta Q}{Q}} = \frac{Q\,(P - VC)}{Q\,(P - VC) - FC} = \frac{Q\,m}{Q\,m - FC} = \frac{Q\,m}{\text{Profit}}$$

Interpretation [Slide 40]: with $OL = 3$, a 1% increase in sales raises profit by 3%, and a 10% fall in sales lowers profit by 30%.

Comments [Slide 41]: the OL captures the sensitivity of operating income to sales; it is an index of economic (operating) risk; it is used to compare businesses of the same sector; and, ceteris paribus, the higher the fixed costs, the higher the OL.

§ 13 Relationship between break-even point and operating leverage [Slide 42]

Since $FC = Q^*\,m$ (with $Q^*$ the break-even point), the leverage depends only on how far the volume is from the break-even point:

$$OL = \frac{Q\,m}{Q\,m - Q^*\,m} = \frac{Q}{Q - Q^*}$$
Q OL Q* (BEP) 1 0 profits: OL > 1 losses: OL < 0
Figure 6. OL = Q / (Q − Q*): above the break-even point the leverage is greater than 1 and falls towards 1 as Q grows; below it the leverage is negative (Slide 42). Q* = 100 units only as an illustration.

§ 14 Margin of safety [Slide 43]

The margin of safety represents the strength of the business: the amount the company is above (or below) the break-even point.

Measured inFormula
units$MS = Q - Q^*$
monetary units$MS = (Q - Q^*)\,m$
percentage$MS = (Q - Q^*)/Q^*$

The percentage form of the slide divides by the break-even volume $Q^*$.

§ 15 Practical formulary

MagnitudeFormulaSlide
Unit margin$m = P - VC$37
Profit$\text{Profit} = Q\,m - FC$39
Break-even point$Q_0 = FC/m$37
Operating leverage$OL = Q\,m/(Q\,m - FC) = Q/(Q - Q^*)$40, 42
Margin of safety$Q - Q^*$; $(Q - Q^*)\,m$; $(Q - Q^*)/Q^*$43
Labour productivitygoods and services / labour34

The eight exercises of the break-even and operating leverage sheet are solved one by one in Problem Set - T4 Break-Even Point and Operating Leverage.